Our Construction System

Fast and Easy - That's the Ezy Homes Advantage!

From our deep consultative process, we individually draft your house plans. We draft and re-draft your plans until you are 100% happy (we don’t charge extra for re-drafts).

An Ezy Homes frame kit can be erected in just 1 week – and built to lock-up stage generally in only 3-4 weeks, even on the most difficult building sites.

Plans are submitted to your local council then, once plans are approved, a surveyor marks the pier footing locations on-site. The footings are dug & poured in a single day – then the footing heights (RL’s) are recorded and provided to Ezy Homes. We then computer engineer and custom manufacture the building components to suit the levels of your site – so that everything simply bolts together on-site. Your steel frame components are delivered to site 3-4 weeks after footings are poured.

Why it works

Six structural advantages over conventional builds.

Pre-engineered

Every frame member is engineered to your specific design before it leaves the factory.

Factory cut & drilled

Holes, lengths and connections are CNC-cut — no on-site fabrication, no waste.

Hot-dip galvanised

Lifetime corrosion protection, suited to coastal, bushfire and high-humidity sites.

Bolts together on-site

No welding required. A small crew can erect the structural shell in days, not weeks.

Suits ANY site

Steep, remote, flood-prone, bushfire-rated — the system adapts where slab-on-ground cannot.

BAL-rated solutions

Compliant strategies for BAL-12.5 through BAL-FZ, including flame-zone exposure.

Client Construction Stages

Follow your build stage by stage.

Whether you choose builder completion or build as an owner-builder, our system follows nine clear, sequential construction stages.

Stage 01

Site Preparation

Your site is surveyed and the footings are poured. The house components can now be custom manufactured to suit your site – which takes about 4 weeks once footings have been poured.

Stage 02

Day 1: Frame Erection

A crane is used to erect the entire steel frame in just 1 day. Because the frame is pre-engineered & pre-drilled, the components simply bolt together. Using a crane is not always necessary, but it does make erection faster & easier.

Stage 03

Day 2-3: Floors & Roof

The flooring is laid now and any sub-floor bracing is installed. The roof frame is constructed, which also simply bolts together. Your designs can use a truss roof or raking roof beams, depending on your climate & preferences.

Stage 04

Day 4-5: Frame Kit Stage

Roof sheeting, roof insulation, and gutters are installed once the roof frame is assembled. The frame kit has now been fully completed.

Stage 05

Week 2: Wall Framing

The wall frames are built now. Timber is standard, steel wall frames are optional. The doors & windows are fitted and the building is wrapped in sarking – ready to cladd.

Stage 06

Week 3-4: Cladding

It’s your choice – Colorbond, Hardie sheet, weatherboards, rendered finish – or a combination of any cladding can be used. Use your imagination to create your own unique home.

Stage 07

Lock-up Stage

Now complete to lock-up stage, the home is ready for external finishing and internal fit-out. This is when your electrical & plumbing “rough-in” is done.

Stage 08

Internal Fit Out

Now the inside of the house really takes shape. Flexible floor plans enable you to transform our plans into YOUR home.

Stage 09

External Finishing

The finishing touches. Painting, balustrades, landscaping, and your personal touches. Here you can DIY many tasks and save $$.

Get started

Tell us about your block.

Comprehensive site consultation, feasibility advice, and a fixed-price materials package tailored to your land.